KOR

ULTRACAPACITOR

Application

UPS / VDP (Sag protector)

SAG Protection for electric power load

  • Installation : Korea, Europe, Japan, China (2008~)
  • Provide protection against short outages and very deep sags (~60sec)
  • End customers: Samsung, LG, Japan Display
  • Purpose: High power/High Current output
    Reducing maintenance fee (Long life time)

※ UPS: uninterruptible power supply

※ VDP: Voltage drop protector, Voltage Sag protector

Recommended module
  • LSUM 051R3C 0166F EA

  • LSUM 032R4C 0250F EA

  • LS UltraGrid Module (19’’ Rack Module)

  • LS UltraGrid (19’’ Cabinet)

AGVs

Cutting down construction cost, line noise, maintenance cost by not using power from production line

  • Installation : Korea, Europe, Japan, China, USA
  • Moves fast and moves in the certain area
  • Can charge often and periodically
  • End customers: Samsung, LG, CSOT, AMAZON, Walmart
  • Purpose
    - Reducing maintenance fee (Long life time)
    - Move fast with excellent power
    - Charge fast

※ AGV: Automated Guided Vehicles

Recommended module

LSUM 048R6C 0166F EA DC

Peak Shaving

Cutting down grid construction cost and maintenance cost by reducing power consumption

  • Installation : Europe, China, USA
  • Electric machines like motors, servo presses or test equipment need high power for short periods
  • Ultracapacitor can output this high power, so no need to install additional Power source in the grid
  • Purpose
    - Reduce peak load of grid connection point
    - Eliminate costs for grid connection expansion
    - Reducing electric charge by covering peak power
Recommended module

LSUM 048R6C 0166F EA DC

LSUM 048R6C 0166F EA YJ

LSUM 129R6C 0062F EA

Harbor Crane

Ultracapacitors cut energy consumption and improve fuel efficiency of cranes

  • Installation : Europe, Korea, North America
  • Continuous operating crane generates high peak load on the grid. Ultracapacitors can be used to provide such peak power so that it ensures the stable operation of cranes
  • Advantages
    - Improving fuel efficiency
    - Reducing investment cost of power infrastructure
    - High reliability
Recommended module

LSUM 048R6C 0166F EA DC

LSUM 048R6C 0166F EA YJ

LSUM 129R6C 0062F EA